ZGS11-Z.F new energy combined substation

Product Overview


1. The transformer, load switch and high-voltage fuse are installed in the transformer box. The insulation liquid of the transformer is used as the insulation and heat dissipation medium of the whole product, and the fully sealed structure is adopted;
2. Small size, light weight and convenient installation;
3. Low noise, low loss, anti-theft, large overload capacity, full-range fuse protection and simple maintenance.

Executive standards


Online inquiry


Provide customers with more secure, stable and intelligent solutions